Change language: Limba Romana   English
Marmet Construct

Projects

The experience gained over the years and the partnerships in which the company is committed are elements that determine a high level of professionalism and promptness in working. ArcelorMittal S.A. Galati was our main client over the years. Work on plant platform belong to the following areas:

  1. Repairing works, upgrading the department congestion-furnaces:
    • UAF: Dismantling, transport, assembly parts Furnace loading area 5
    • Marmet Construct - UAF

      Marmet Construct - UAF

      Marmet Construct - UAF

      Marmet Construct - UAF

      Marmet Construct - UAF

    • UAF-Furnace 5: Loading with welding the flange of the dome of the furnace
    • Marmet Construct - UAF

    • UAF-Furnace 5: Consolidation beam skip
    • UAF-Furnace 5: Mechanical works installation of dedusting Estacada hoppers
    • Marmet Construct - UAF

    • UAF-Furnace 5: Works load area (assembly knurl, skips) in subcontracting to PIRSON Belgium
    • Marmet Construct - UAF

      Marmet Construct - UAF

  2. Installation works:
    • Congestion furnace plant: Furnace number 5 - PSI installation and sanitary Estacada hoppers
    • Congestion furnace plant: The link between cooling water pumping stations, pipeline connecting the pumping station UAF-Furnace 5
    • UPDES: Recovery coke gas distribution system
    • UPDES: Construction and assembly works: Repair of sewage collector system – Collectors C7-C2
    • UPDES: Modernization of gas condensate exhaust system and gas the furnace coke in the ULP-UCC
    • UPDES: Construction and assembly works: Restoration collector C6 Malina
    • UPDES: Construction and assembly works: Upgrading phenolic water condensation exhaust plant in the UAF
    • Marmet Construct - UPDES

    • UPDES: Construction and assembly works: Upgrading Priza Dunarii Station
    • Marmet Construct - UPDES

      Marmet Construct - UPDES

    • UPDES: Condensation exhaust system from gas pipes the furnace area ULP (turnkey project)
    • Marmet Construct - UPDES

    • UPDES : RK phenolic water evacuation system bus no. 3 the furnace gas area UAF (turnkey project)
    • Marmet Construct - UPDES

  3. Works for environmental protection:
    • Upgrading electrofilters Lime Factory
    • UAF-Furnace 5: Upgrading electrostatic in subcontracting to FLS Airtech Denmark
    • Marmet Construct - UAF

  4. Works of manufacturing and installation of steel structures:
    • Exploitation Plant and Conveying
    • Construction and assembly works: Planning hall HPL3 and foundation for Torpedo pots
    • Marmet Construct - Uzina Exploatare si Transport Uzinal

      Marmet Construct - Uzina Exploatare si Transport Uzinal

      Marmet Construct - Uzina Exploatare si Transport Uzinal

    • Congestion: Consolidation of resistance structure, for electrofilters no. 3 and 4
  5. Maintenance works during 2010-2011:
    • UAF: Repetitive mechanical works Winches Warehouse – Furnaces 3 and 4
    • LBC: Planned revisions LBC – 2010
    • LTG 2: Annual repair works at LTG 2
    • Isolation works at the blowers boilers in subcontracting at Energoutil Contact S.A. Bucharest
    • Marmet Construct - Energoutil Contact S.A.

      Marmet Construct - Energoutil Contact S.A.

      Marmet Construct - Energoutil Contact S.A.

      Marmet Construct - Energoutil Contact S.A.

  6. Locally we developed confections and assembly works for structure steel:
    • Nocturne installation at "Otelul" Galati stadium (subcontracting)
    • Marmet Construct - Nocturna stadionului Otelul Galati

      Marmet Construct - Nocturna stadionului Otelul Galati

      Marmet Construct - Nocturna stadionului Otelul Galati

    • Construction and planning halls and assembly equipments (automated electrostatic painting lines, thermal plants, warehouses, etc.) at S.C. FAM S.A. GALATI
    • Construction and installation of steel platforms for S.C. COMCEREAL S.A. BUCHAREST
  7. Works at heating systems:
    • Upgrading heating plants S.C. APATERM S.A. Galati (subcontracting)

Permits and licenses for execution


Marmet Construct - ISO 9001:2008

Marmet Construct - ISCIR



Home   |   Company presentation   |   Projects   |   Certificates   |   Company policy   |   Contact
   
Valid XHTML 1.0 Transitional     CSS valid!   

© Copyright 2012 - Website created by Vornicescu Ionut